Final Treated Effluent – (Fracking Water)

20140708_123238_resizedIMG_0747ANC Transloading Inc. announces that as of September 8, 2015 we have commenced loading of Final Treatment Effluent (TFE) for use in fracking. The water is heated to 30 degrees Celsius which means it is ideal for winter time operations and will reduce the need for on-site heating from ambient temperatures. The Alberta Government has authorized Alberta Newsprint Co. to divert a specified quantity of TFE per day for use in Fracking.  As this hot water will be in high demand through the winter season please contact us early to reserve your needs. Supply is limited to quantities specified by the AER.

We have partnered with Vertex to  supply and operate the pump equipment at our Whitecourt location.

Contact us at 780-706-8241 or email at nielsj@albertanewsprint.com

Over Dimensional/Heavy Lift Operations

IMG_0666ANC Transloading Inc. has again diversified the use of their Whitecourt facility by working with RailTran Services Inc. and Premay Heavy Haul that resulted in some heavy and over dimensional cargo being brought on site in Whitecourt. Our location is strategically located across the Athabasca River eliminating the need for special permits and rigging to cross the river on the Hwy 43 bridge. This heavy lift gas separator was off-loaded from the specialized rail car onto a Premay Heavy Haul truck, that will delivery the vessel to it’s ultimate destination a gas plant located few miles west of ANC on Hwy 43.